Username: Password:
Join Free | Subscribe Now | Member Area | 中文版
Industry NewsThe current position: Homepage > News > Industry News

Sesa Sterlite updates production of zinc India

Time:Tue, 14 Oct 2014 03:33:00 +0800

keywords :

During Q2, mined metal production was 30% higher than Q1, but 4% lower than the corresponding prior quarter. This is in line with our mine plan at Rampura Agucha mine of lower mined metal production in the H1 of the year as we excavated more waste than ore and exposed the ore body by end September, which will contribute to higher volumes in the H2 of the year.

Integrated production of refined zinc, lead and silver was lower than the corresponding prior period due to lower mined metal production and smelter shutdown.

About us|Contact us|Subscriber Terms|Advertisement
CopyRight©2024 Mining-Bulletin www.mining-bulletin.com All Rights Reserved.